Water
Our goals to 2030
-50%
of total water withdrawal
at the Davines Group Village, including offices and the production facility*, compared with 2023 levels.
-75%
of production water insensity
calculated as the cubic meters of water treated through reverse osmosis and used directly in production processes per tonne of bulk product manufactured in-house, compared with 2023 levels.
Our journey
2018
2020
2021
2023-2024
2025
2018